Press-On
Fan & Fixture
Mounting Boxes

The fastest, easiest way to mount fans and fixtures. Ships ready-to-install!

Save Money with
Bulk Packaging!

UL listed for fans up to 70 lbs. and fixtures up to 200 lbs.

Features and Benefits

  • Ready-to-install

  • Gripping tangs press-hold to the joist while you reach for your screwdriver
  • Comes with NM connector installed and mud cover in place
  • Center screw is shipped-in-place
  • Fan/fixture installation screws are "parked"... ready for easy fan/fixture bracket installation!
  • 2-hour fire rating

Note: Install fan or fixture (not included) in accordance with manufacturer's instructions and all local applicable electrical codes, using the parked screws provided.

Catalog
Number
UPC/DCI/NAED
MFG #01 8997
DESCRIPTION/
STYLE
UNIT
PKG
STD
PKG
DIM
A
DIM
B
DIM
C
FB415 72167 For 1/2" or 5/8" Drywall
10.3 Cu. In.
25 25 2.250 .500 4.250
FB4150* 72182 For 1/2" or 5/8" Drywall
10.3 Cu. In.
100 100 2.250 .500 4.250
FB423cross.GIF (105 bytes) 72190 For 1/2" or 5/8" Drywall
19.3 Cu. In.
25 25 3.000 1.250 4.250
FB426 72179 For 1/2" or 5/8" Drywall
16.0 Cu. In.
25 25 2.625 .500 4.250

*Bulk packing for lower cost.

cross.GIF (105 bytes)Accommodates 1/2" or 5/8" drywall with 3/4" furring strips or hat channel.

Patented. Additional Patent(s) Pending


E170558  LR49636

CSA - Acceptable for Fan Support

Each fan/fixture box includes...
Press-on box with ready-to-tighten center screw, installed NM cable connector, second k.o., and two screws for bracket installation (screwed in place until removed by installer.)

Installation Instructions

FB145

1

2

  1. Press box onto joist. Gripping tangs hold the box in place temporarily.

  2. Tighten center screw to secure to joist.

  3. Push NM cable through connector.

  4. Remove two long, "parked" screws for installation of bracket.

  5. Use the screws to install fan/fixture bracket through the oval slots in the box, directly into the joist.

3

4

5