Our kits include mounting block with built-in electrical box, cable
connector, (4) screws,(4) washers
FB90
Cut a 2X4 approximately 12" long, to span the pitch rafters.
FB45 Trim
a 2X8 approximately 16" long. Allow the panel to extend 8-10 past the
FB45.
___________
Remove the knockout from the
electrical box and insert the cable connector into the hole.
___________
Install the FB50 into
the center of the cut 2X4 using the (2) #8 x 1-1/2 screws provided.
Install the FB45 on the 2X8
using the (2) #8 x 1-1/2 screws provided.
Position the 2X4 with the FB90
attached to the angled rafters, keeping the bottom of the box level, and
the short sides touching the angled rafters. Nail or screw the assembly, spanning
both angled rafters.
Score and trim FB45
as necessary, keeping bottom of box level. (Short side needs to touch
rafter) Trim wood as necessary to butt it to rafter. Nail or crew assembly
to rafter.
Push
the cable through the cable connector into the electric box.
Install Ceiling. FB90 and FB45 are paintable if required.
Install
Fixture or Fan (not included) in accordance with manufacturer's
instructions and all local applicable codes, using the (2) #10 X 3-1/2
long screws and